Case Study
Alder Grange Technology College, Rossendale, Lancashire.
The school had a new technology class room built the building inspector said the room had to have 10 air changes per hour before the project could be signed off, to do this with fans would have caused massive heat losts during the winter months. We explained to the architects that what they needed was an heat exchanger system like the Daikin Vam System.
|
Daikin VAM1000FA |

Air Return |

Air Discharge |

Foul Air out / Fresh Air in |

Discharge and intake grille |
Installation took place during school holidays.
|
|